Question: A feasible solution to the linear programming problem should [A]. satisfy the problem constraints [B]. optimise the objective function [C]. satisfy the problem constraints and non-negativity restrictions [D]. satisfy the non-negativity restrictions Answer: Option C Explanation: No answer description…

Question: The aim of value engineering is to [A]. find the depreciation value of a machine [B]. determine the selling price of a product [C]. minimise the cost without change in quality of the product [D]. all of the above…

Question: In value engineering, the term value refers to [A]. manufacturing cost of the product [B]. selling price of the product [C]. total cost of the product [D]. utility of the product Answer: Option D Explanation: No answer description available…

Question: Gantt chart gives information about [A]. scheduling and routing [B]. sales [C]. production schedule [D]. machine utilisation Answer: Option C Explanation: No answer description available for this question.

Question: Gantt chart is used for [A]. inventory control [B]. material handling [C]. production schedule [D]. machine repair schedules Answer: Option C Explanation: No answer description available for this question.

Question: In jobbing production [A]. highly skilled workers are needed [B]. unit costs are high [C]. operations are labour-intensive [D]. all of these Answer: Option D Explanation: No answer description available for this question.

Question: Acceptance sampling is used in [A]. job production [B]. batch production [C]. mass production [D]. all of these Answer: Option C Explanation: No answer description available for this question.