Break even point is the point where

Question: Break even point is the point where
[A].

fixed and variable cost lines intersect

[B].

fixed and total cost lines intersect

[C].

variable and total cost lines intersect

[D].

sales revenue and total expensive lines intersect

Answer: Option D

Explanation:

No answer description available for this question.

Break even point is the point where Read More »

Industrial Engineering And Production Management, Mechanical Engineering

Abbreviated work factor data is applied for

Question: Abbreviated work factor data is applied for
[A].

material handling operation

[B].

maintenance operation

[C].

packing and shipping operation

[D].

all of these

Answer: Option D

Explanation:

No answer description available for this question.

Abbreviated work factor data is applied for Read More »

Industrial Engineering And Production Management, Mechanical Engineering

P.M.T.S. (Predetermined Motion Time Systems) include

Question: P.M.T.S. (Predetermined Motion Time Systems) include
[A].

M.T.M. (Method Time Measurement)

[B].

W.F.S. (Work Factor Systems)

[C].

B.M.T.S. (Basic Motion Time Study)

[D].

all of these

Answer: Option D

Explanation:

No answer description available for this question.

P.M.T.S. (Predetermined Motion Time Systems) include Read More »

Industrial Engineering And Production Management, Mechanical Engineering

Micromotion study is

Question: Micromotion study is
[A].

analysis of one stage of motion chart

[B].

motion study, when seen on a time chart

[C].

subdivision of an operation into therbligs and their analysis

[D].

enlarged view of motion study

Answer: Option C

Explanation:

No answer description available for this question.

Micromotion study is Read More »

Industrial Engineering And Production Management, Mechanical Engineering

Performance rating is equal to

Question: Performance rating is equal to
[A].

observed performance + normal performance

[B].

observed performance – normal performance

[C].

observed performance x normal performance

[D].

none of the above

Answer: Option D

Explanation:

No answer description available for this question.

Performance rating is equal to Read More »

Industrial Engineering And Production Management, Mechanical Engineering

In time study, the rating factor is applied to determine

Question: In time study, the rating factor is applied to determine
[A].

standard time of a job

[B].

merit rating of the worker

[C].

fixation of incentive rate

[D].

normal time of a worker

Answer: Option D

Explanation:

No answer description available for this question.

In time study, the rating factor is applied to determine Read More »

Industrial Engineering And Production Management, Mechanical Engineering