P.M.T.S. (Predetermined Motion Time Systems) include

Question: P.M.T.S. (Predetermined Motion Time Systems) include
[A].

M.T.M. (Method Time Measurement)

[B].

W.F.S. (Work Factor Systems)

[C].

B.M.T.S. (Basic Motion Time Study)

[D].

all of these

Answer: Option D

Explanation:

No answer description available for this question.