In a network shown in the below figure, the critical path is along

Question: In a network shown in the below figure, the critical path is along
[A].

1-2-3-4-8-9

[B].

1-2-3-5-6-7-8-9

[C].

1-2-3-4-7-8-9

[D].

1-2-5-6-7-8-9

Answer: Option B

Explanation:

No answer description available for this question.