When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________________?
A. seal coat
B. tack coat
C. prime coat
D. spray of emulsion
A. seal coat
B. tack coat
C. prime coat
D. spray of emulsion
A. dry rolling, wet rolling, application of screening and application of filler
B. dry rolling, application of filler, wet rolling and application of screening
C. dry rolling, application of screening, wet rolling and application of filler
D. dry rolling, application of screening, application of filler and wet rolling
A. cement
B. lime
C. bitumen
D. none of the above
The binder normally used in flexible pavement construction is________________? Read More »
Highway Engineering, MCQs / Q&A A. 8 cubic meter
B. 10 cubic meter
C. 12 cubic meter
D. 15 cubic meter
A. 500 tonnes per day
B. 1000 tonnes per day
C. 1500 tonnes per day
D. 2000 tonnes per day
Maximum daily traffic capacity of bituminous pavements is______________? Read More »
Highway Engineering, MCQs / Q&A A. climatic condition
B. type and intensity of traffic
C. subgrade soil and drainage conditions
D. availability of funds for the construction project
The fundamental factor in the selection of pavement type is_____________? Read More »
Highway Engineering, MCQs / Q&A A. 0
B. 25 mm
C. 50 mm
D. 100 mm
The maximum thickness of expansion joint in rigid pavements is______________? Read More »
Highway Engineering, MCQs / Q&A A. good
B. fair
C. poor
D. very poor
A. load stress + warg stress frictional stress
B. load stress + warg stress + frictional stress
C. load stress + warg stress
D. load stress + frictional stress
A. 2.5 m
B. 3.5 m
C. 4.5 m
D. 5.5m
The maximum spacing of contraction joints in rigid pavements is_____________? Read More »
Highway Engineering, MCQs / Q&A