Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by whitelisting our website.

Estimating and Costing

While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?

While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?

A. At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar
B. In thin slabs, 12 mm minimum or diameter of the bar whichever is more
C. For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more
D. All the above

While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________? Read More »

Estimating and Costing