S: 1 and length is______________?
S: 1 and length is______________? A. d × d × s B. d2 × ( ds)2]C. L.D 1 + s2) D. 2 L.D 1 + s 2)
S: 1 and length is______________? A. d × d × s B. d2 × ( ds)2]C. L.D 1 + s2) D. 2 L.D 1 + s 2)
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient…
Pick up the item whose weight is added to the weight of respective item, is________________? A. Cleats B. Brackets C. BoltsD. All the above
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________? A. 1.00 m3B. 1.25 m3 C. 1.50 m3 D. 1.75 m3
The height of the sink of wash basin above floor level is kept____________________? A. 60 cm B. 70 cmC. 75 cm to 80 cm D. 80 cm
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________? A. 0.200 m3 B. 0.247 m3C. 0.274 m3 D. 0.295 m3
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________? A. 0.90 m3B. 0.94 m3 C. 0.98 m3 D. 1.00 m3
The expected out turn of half brick partition wall per mason per day is___________________? A. 1.5 m 3B. 2.0 m3 C. 4.0 m2 D. 5.0 m2
The slope of the outlet of ‘P trap’ below the horizontal is kept________________? A. 8° B. 10° C. 12°D. 14°
Berms are provided in canals if these are__________________? A. Fully in excavationB. Partly in excavation and partly in embankment C. Fully in embankment D. All the above