A. Breadth of the wall
B. Half breadth of wall on each side
C. One fourth breadth of wall on each side
D. None of these
A. Breadth of the wall
B. Half breadth of wall on each side
C. One fourth breadth of wall on each side
D. None of these
A. 0.01 sqm
B. 0.02 sqm
C. 0.03 sqm
D. 0.04 sqm
A. 1.5 m 3
B. 2.5 m3
C. 3.5 m3
D. 5.0 m3
A. 1.80 litres for 5 to 10 users
B. 1.20 litres for 15 users
C. 1.35 for 20 users
D. All the above
A. Excavation
B. Surface dressing
C. Cutting
D. Surface excavation
A. b – rd)²/(r – s)
B. b – rd)²/(r + s)
C. ½ × (b + rd)²/(r – s)
D. b – rd)²/(s – r)
A. Earthwork, Concrete work, Brick work
B. Brickwork, Stone work, Roofing
C. Brickwork Flooring, Wood work, Steel work
D. All the above
A. Water closets
B. Flushing pipes
C. Lavatory basins
D. All the above
A. Cement concrete in foundation
B. R.C.C. structure
C. Hollow concrete block wall
D. None of these
A. [sb² + r² (2bd + sd)²]/(r² – s²)
B. [sb² + r² (2bd + sd)²]/(r² – s5)
C. [sb² + r² (2bd + sd)²]/(r – s)
D. None of these