In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?

August 15, 2021January 20, 2019 by admin
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?

A. Breadth of the wall
B. Half breadth of wall on each side
C. One fourth breadth of wall on each side
D. None of these

Categories Estimating and Costing

The area is measured correct to the nearest___________________?

August 15, 2021January 20, 2019 by admin
The area is measured correct to the nearest___________________?

A. 0.01 sqm
B. 0.02 sqm
C. 0.03 sqm
D. 0.04 sqm

Categories Estimating and Costing

The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________?

August 15, 2021January 20, 2019 by admin
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________?

A. 1.5 m 3
B. 2.5 m3
C. 3.5 m3
D. 5.0 m3

Categories Estimating and Costing

As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?

August 15, 2021January 20, 2019 by admin
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?

A. 1.80 litres for 5 to 10 users
B. 1.20 litres for 15 users
C. 1.35 for 20 users
D. All the above

Categories Estimating and Costing

The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as_______________?

August 15, 2021January 20, 2019 by admin
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as_______________?

A. Excavation
B. Surface dressing
C. Cutting
D. Surface excavation

Categories Estimating and Costing

The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?

August 15, 2021January 20, 2019 by admin
The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?

A. b – rd)²/(r – s)
B. b – rd)²/(r + s)
C. ½ × (b + rd)²/(r – s)
D. b – rd)²/(s – r)

Categories Estimating and Costing

For the construction of buildings, the subheads of the estimate are________________?

August 15, 2021January 20, 2019 by admin
For the construction of buildings, the subheads of the estimate are________________?

A. Earthwork, Concrete work, Brick work
B. Brickwork, Stone work, Roofing
C. Brickwork Flooring, Wood work, Steel work
D. All the above

Categories Estimating and Costing

Cost of fittings and their fixing is specified for the following sanitary fittings________________?

August 15, 2021January 20, 2019 by admin
Cost of fittings and their fixing is specified for the following sanitary fittings________________?

A. Water closets
B. Flushing pipes
C. Lavatory basins
D. All the above

Categories Estimating and Costing

The measurement is made in square metre in case of_________________?

August 15, 2021January 20, 2019 by admin
The measurement is made in square metre in case of_________________?

A. Cement concrete in foundation
B. R.C.C. structure
C. Hollow concrete block wall
D. None of these

Categories Estimating and Costing

The area of the cross-section of a road fully in banking shown in the given figure, is________________?

August 15, 2021January 20, 2019 by admin
The area of the cross-section of a road fully in banking shown in the given figure, is________________?

A. [sb² + r² (2bd + sd)²]/(r² – s²)
B. [sb² + r² (2bd + sd)²]/(r² – s5)
C. [sb² + r² (2bd + sd)²]/(r – s)
D. None of these

Categories Estimating and Costing