Estimating and Costing

The item of the brick structure measured in sq.m, is___________________?

August 15, 2021January 20, 2019 by admin
The item of the brick structure measured in sq.m, is___________________?

A. Reinforced brick work
B. Broken glass cog
C. Brick edging
D. Brick work in arches

Categories Estimating and Costing

According to ISI method of measurement, the order of the sequence is_________________?

August 15, 2021January 20, 2019 by admin
According to ISI method of measurement, the order of the sequence is_________________?

A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. None of these

Categories Estimating and Costing

The most reliable estimate is_________________?

August 15, 2021January 20, 2019 by admin
The most reliable estimate is_________________?

A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate

Categories Estimating and Costing

While preparing a detailed estimate__________________?

August 15, 2021January 20, 2019 by admin
While preparing a detailed estimate__________________?

A. Dimension should be measured correct to 0.01 m
B. Area should be measured correct to 0.01 sqm
C. Volume should be measured correct to 0.01 cum
D. All the above

Categories Estimating and Costing

The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?

August 15, 2021January 20, 2019 by admin
The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?

A. 2.5 sqm
B. 5.0 sqm
C. 7.5 sqm
D. 10 sqm

Categories Estimating and Costing

Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?

August 15, 2021January 20, 2019 by admin
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?

A. 2.0 %
B. 2.5 %
C. 4.0 %
D. 5.0 %

Categories Estimating and Costing

The measurement is not made in square metres in case of________________?

August 15, 2021January 20, 2019 by admin
The measurement is not made in square metres in case of________________?

A. D.P.C. (Damp proof course)
B. Form works
C. Concrete Jeffries
D. R.C. Chhajja

Categories Estimating and Costing

The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?

August 15, 2021January 20, 2019 by admin
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?

A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500

Categories Estimating and Costing

The trap which is provided to disconnect the house drain from the street sewer is called_________________?

August 15, 2021January 20, 2019 by admin
The trap which is provided to disconnect the house drain from the street sewer is called_________________?

A. Master trap
B. Intercepting trap
C. Interception manhole
D. All the above

Categories Estimating and Costing

Pick up the excavation where measurements are made in square metres for payment ?

August 15, 2021January 20, 2019 by admin
Pick up the excavation where measurements are made in square metres for payment ?

A. Ordinary cuttings up to 1 m
B. Surface dressing up to 15 cm depths
C. Surface excavation up to 30 cm depths
D. Both B. and C.

Categories Estimating and Costing