A. At every change of direction
B. At every change of gradient
C. At every 30 m intervals
D. All the above
A. At every change of direction
B. At every change of gradient
C. At every 30 m intervals
D. All the above
A. Setting and laying
B. Bed concreting
C. Connection to drains
D. All of these
A. The walls along with doors and other openings
B. Bath room and lavatory
C. Kitchen and pantry
D. All the above
A. 2.5 sq m
B. 4.0 sq m
C. 6.0 sq m
D. 8.0 sq m
A. Wall facing
B. Columns, lintels, cogs
C. Building work
D. A. and D. of the above
A. L + 0.42 d
B. L + (2 × 0.42 d)
C. L – (0.42 d)
D. L – (2 × 0.4 d)
A. Root slabs
B. Floors
C. Wall panels
D. All the above
A. 26,000 m3
B. 26,500 m3
C. 27,000 m3
D. 27,500 m3
A. Main soil pipe
B. Bottom of P trap W.C.
C. Top of P trap W.C.
D. Side of water closet
A. (6 + 15) chains
B. (6 + 12) chains
C. (6 + 18) chains
D. None of these