The inspection pit or chamber is a manhole provided in a base drainage system________________?
A. At every change of direction
B. At every change of gradient
C. At every 30 m intervals
D. All the above
A. At every change of direction
B. At every change of gradient
C. At every 30 m intervals
D. All the above
A. Setting and laying
B. Bed concreting
C. Connection to drains
D. All of these
A. The walls along with doors and other openings
B. Bath room and lavatory
C. Kitchen and pantry
D. All the above
Carpet area does not include the area of_________________? Read More »
Estimating and Costing A. 2.5 sq m
B. 4.0 sq m
C. 6.0 sq m
D. 8.0 sq m
The expected out turn of 12 mm plastering with cement mortar is_______________? Read More »
Estimating and Costing A. Wall facing
B. Columns, lintels, cogs
C. Building work
D. A. and D. of the above
The measurement is made for stone work in square metre in case of________________? Read More »
Estimating and Costing A. L + 0.42 d
B. L + (2 × 0.42 d)
C. L – (0.42 d)
D. L – (2 × 0.4 d)
A. Root slabs
B. Floors
C. Wall panels
D. All the above
A. 26,000 m3
B. 26,500 m3
C. 27,000 m3
D. 27,500 m3
A. Main soil pipe
B. Bottom of P trap W.C.
C. Top of P trap W.C.
D. Side of water closet
Anti-siphonage pipe is connected to__________________? Read More »
Estimating and Costing A. (6 + 15) chains
B. (6 + 12) chains
C. (6 + 18) chains
D. None of these