At a given port, the fetch is 400 nautical miles, the maximum height of storm wave will be_______________?
		A. 2.073 m
B. 8.169 m
C. 9.144 m
D. 6.8 m
		A. 2.073 m
B. 8.169 m
C. 9.144 m
D. 6.8 m
		i) varies with latitude and season
ii) is more than displacement tonnage
iii) is the difference between displacement load and displacement light
select the correct statemens.
A. i) and ii) are correct
B. ii) and iii) are correct
C. i) and iii) are correct
D. Only iii) is correct
		A. 2.5 m
B. 4 m
C. 5 m
D. 7 m
		Select your answer based on the coding system given below.
A. Both A and R are true and R is the correct explanation of A.
B. Both A and R are true but R is not the correct explanation of A.
C. A is true but R is false.
D. A is false but R is true.
		A. L
B. 1.5 L
C. 2.0 L
D. 4.0 L
where L is the length of the largest ship to use the port
		A. The progress of work in low level method of mound construction is very slow.
B. Barge method of mound construction is economical.
C. In low level method of mound construction, the area of working is limited.
D. In staging method of mound cons-truction, the work is not interrupted even during stormy weather
		A. vertical sea wall
B. sea wall with batter
C. stepped sea wall
D. sea wall with concave face