As compared to wall type breakwater, mound type breakwater_________________?
A. requires skilled labour
B. requires low maintenance cost
C. requires less material
D. results in less damage due to gradual failure
A. requires skilled labour
B. requires low maintenance cost
C. requires less material
D. results in less damage due to gradual failure
Select your answer based on the coding system given below.
A. Both A and R are true and R is the correct explanation of A.
B. Both A and R are true but R is not the correct explanation of A.
C. A is true but R is false.
D. A is false but R is true.
A. 2.5 m
B. 4 m
C. 5 m
D. 7 m
A. The progress of work in low level method of mound construction is very slow.
B. Barge method of mound construction is economical.
C. In low level method of mound construction, the area of working is limited.
D. In staging method of mound cons-truction, the work is not interrupted even during stormy weather
A. marine railways, dry docks, floating docks, wet docks
B. dry docks, wet docks, floating docks, lift docks
C. wet docks, floating docks, lift docks, marine railways
D. wet docks, lift docks, marine railways, dry docks
A. the length of design vessel
B. the length of design vessel + 10% clearance between adjacent vessels
C. the length of design vessel + 20% clearance between adjacent vessels
D. twice the length of design vessel
A. 0.34 VF
B. 0.5 VF
C. 1.5 VF
D. 3.4 VF
where F is the fetch in km