Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by whitelisting our website.

When high flood passing down weir creating high up lift pressures and there is no flow in the canals, if such condition is taken for design and is called__________________?

When high flood passing down weir creating high up lift pressures and there is no flow in the canals, if such condition is taken for design and is called__________________?

A. High flood level
B. Dangerous condition
C. Hydraulic design condition
D. Worst condition