Unit of runoff in M.K.S. system is________________?
A. cubic metre/sec
B. metre/sec
C. cubic metre
D. square metre
A. cubic metre/sec
B. metre/sec
C. cubic metre
D. square metre
A. designed for one purpose but serves more than one purpose
B. planned and constructed to serve various purposes
C. both (A. and (B.
D. none of the above
A. submerged pipe outlet
B. Kennedy’s gauge outlet
C. Gibb’s outlet
D. none of the above
A. ogee spillway
B. chute spillway
C. side channel spillway
D. shaft spillway
A. high flood drainage discharge is small
B. high flood drainage discharge is large and short lived
C. high flood drainage discharge is large and continues for a long time
D. none of the above
A. same duration only
B. same and shorter duration
C. same and longer duration
D. any duration
A. lower level
B. higher level
C. same level
D. any of the above depending on the design