Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by whitelisting our website.

The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is_________________?

The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is_________________?

A. 1 in 100 upward
B. 1 in 500 upward
C. 1 in 100 downward
D. 1 in 503 upward