The process of incorporating changes and rescheduling or replanning is called_______________?
		A. resource levelling
B. resource smoothening
C. updating
D. critical path scheduling
		A. resource levelling
B. resource smoothening
C. updating
D. critical path scheduling
		A. 3.5 and 5/6
B. 5 and 25/36
C. 3.5 and 25/36
D. 4 and 5/6
		A. free float of the activity must be zero but independent float need not be zero
B. independent float must be zero but free float need not be zero
C. free float and independent float both must be zero
D. free float and independent float both need not be zero
		A. Ice
B. Concrete
C. Loose sand
D. Earth
		A. 2
B. 4
C. 8
D. 7
		Consider the following statements ?
1. greater than Total Float.
2. greater than Independent Float
3. equal to Total Float.
4. less than Independent Float. Of these statements
A. 1 and 4 are correct
B. 2 and 3 are correct
C. 1 and 4 are correct
D. 1 and 2 are correct
		A. equal to X
B. more than X
C. less than X
D. any of the above