The laying of sewers is done with____________________?
The laying of sewers is done with____________________?
A. Magnetic compass
B. Theodolite
C. Level
D. Clinometer
A. Magnetic compass
B. Theodolite
C. Level
D. Clinometer
A. Are used for carrying sewage and drainage from houses
B. Are manufactured from clays and shale
C. After casting are dried and burnt at temperature 150°C, 700°C and 1200°C
D. All the above
A. high velocity
B. high pressure
C. weak material
D. low pressure
E. low viscosity
A. Bourdon tube
B. Pirani Gauge
C. micro-manometer
D. ionisastion gauge
E. McLeod gauge
A. 2 to 3 mm
B. 3 to 5 mm
C. 5 to 8 mm
D. 8 to 10 mm
A. 1000 kg
B. 4000 kg
C. 2000 kg
D. 8000 kg
E. 16000 kg
A. sin 9
B. sin 9
C. casS
D. cos 9
E. tan 9