The direct cost of a project with respect to normal time is________________?
		A. minimum
B. maximum
C. zero
D. infinite
		A. minimum
B. maximum
C. zero
D. infinite
		(i) Output can be increased by reducing the angle of swing for a given depth of cut
(ii) For a given angle of swing, output will be maximum at optimum depth of cut
(iii) Output can be increased by keeg the depth of cut less than optimum depth
(iv) Output can be increased by increasing the size of shovel
select the correct statements?
A. (ii), (iii) and (iv) are correct
B. (i), (ii) and (iv) are correct
C. (i), (iii) and (iv) are correct
D. (i) and (iv) are correct
		A. expected time of activity A is greater than the expected time of activity B
B. expected time of activity B is greater than the expected time of activity A
C. expected time of both activities A and B are same
D. none of the above
		A. an activity
B. an event
C. both event and activity
D. none of the above
		A. 9 days
B. 13 days
C. 14 days
D. 19 days
		Consider the following statements ?
1. greater than Total Float.
2. greater than Independent Float
3. equal to Total Float.
4. less than Independent Float. Of these statements
A. 1 and 4 are correct
B. 2 and 3 are correct
C. 1 and 4 are correct
D. 1 and 2 are correct
		A. 3.5 and 5/6
B. 5 and 25/36
C. 3.5 and 25/36
D. 4 and 5/6