Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by whitelisting our website.

Civil Engineering

A tetrahedron is made to place on H.P that is with its axis perpendicular to it and one of the edges of base parallel to V.P and then the tetrahedron is made to rotate w.r.t to H.P up to an acute angle. The top view of previous and later one is                            

Question:

A tetrahedron is made to place on H.P that is with its axis perpendicular to it and one of the edges of base parallel to V.P and then the tetrahedron is made to rotate w.r.t to H.P up to an acute angle. The top view of previous and later one is                            

A.

isosceles triangle, isosceles triangle

B.

equilateral triangle, isosceles triangle

C.

equilateral triangle, square

D.

square, irregular polygon of 4 sides

Answer» b. equilateral triangle, isosceles triangle

Note: The above multiple-choice question is for all general and Competitive Exams in India

A tetrahedron is made to place on H.P that is with its axis perpendicular to it and one of the edges of base parallel to V.P and then the tetrahedron is made to rotate w.r.t to H.P up to an acute angle. The top view of previous and later one is                             Read More »

» Engineering Graphics solved MCQs

The top view, front view and side view of a triangle parallel to vertical plane, circle parallel to profile plane and rectangle parallel to horizontal plane respectively are

Question:

The top view, front view and side view of a triangle parallel to vertical plane, circle parallel to profile plane and rectangle parallel to horizontal plane respectively are

A.

line, circle, line

B.

triangle, line, rectangle

C.

triangle, line, line

D.

line, line, line

Answer» d. line, line, line

Note: The above multiple-choice question is for all general and Competitive Exams in India

The top view, front view and side view of a triangle parallel to vertical plane, circle parallel to profile plane and rectangle parallel to horizontal plane respectively are Read More »

» Engineering Graphics solved MCQs

The necessity of high strength concrete in prestressed concrete is due to                      

Question:

The necessity of high strength concrete in prestressed concrete is due to                      

A.

shear and bonding

B.

loading and unloading

C.

cracking

D.

bending

Answer» a. shear and bonding

Note: The above multiple-choice question is for all general and Competitive Exams in India

The necessity of high strength concrete in prestressed concrete is due to                       Read More »

» Structural Design 2 solved MCQs

In the zone of anchorages the material preferred to minimize costs is                      

Question:

In the zone of anchorages the material preferred to minimize costs is                      

A.

high strength steel

B.

high strength bars

C.

high strength tendons

D.

high strength concrete

Answer» d. high strength concrete

Note: The above multiple-choice question is for all general and Competitive Exams in India

In the zone of anchorages the material preferred to minimize costs is                       Read More »

» Structural Design 2 solved MCQs