A. -5, 3
B. 3, 5
C. -3, 5
D. -3, -5
Explanation:
x2 + 5x – 3x – 15 = 0
x(x + 5) – 3(x + 5) = 0
(x – 3)(x + 5) = 0
=> x = 3 or x = -5.
A. -5, 3
B. 3, 5
C. -3, 5
D. -3, -5
Explanation:
x2 + 5x – 3x – 15 = 0
x(x + 5) – 3(x + 5) = 0
(x – 3)(x + 5) = 0
=> x = 3 or x = -5.
A. 4 : 3
B. 8 : 7
C. 4 : 1
D. 6 : 5
Let the length and breadth of the carpet in the first case be 3x units and 2x units respectively.
Let the dimensions of the carpet in the second case be 7y, 3y units respectively.
From the data,.
2(3x + 2x) = 2(7y + 3y)
=> 5x = 10y
=> x = 2y
Required ratio of the areas of the carpet in both the cases
= 3x * 2x : 7y : 3y
= 6×2 : 21y2
= 6 * (2y)2 : 21y2
= 6 * 4y2 : 21y2
= 8 : 7
A. 91.5 cm
B. 93.5 cm
C. 94.5 cm
D. 92.5 cm
Perimeter of the sector = length of the arc + 2(radius)
= (135/360 * 2 * 22/7 * 21) + 2(21)
= 49.5 + 42 = 91.5 cm
A. 140
B. 156
C. 175
D. 214
Given that the area of the square = 1225 sq.units
=> Side of square = √1225 = 35 units
The radius of the circle = side of the square = 35 units Length of the rectangle = 2/5 * 35 = 14 units
Given that breadth = 10 units
Area of the rectangle = lb = 14 * 10 = 140 sq.units
A. 225 sq.m
B. 360 sq.m
C. 600 sq.m
D. 480 sq.m
A. 81 : 121
B. 9 : 11
C. 729 : 1331
D. 27 : 12
Ratio of the sides = ³√729 : ³√1331 = 9 : 11
Ratio of surface areas = 92 : 112 = 81 : 121
A. 45 cm
B. 18 cm
C. 90 cm
D. None of these
Volume of the wire (in Cylindrical shape) is equal to the volume of the sphere.
π(16)2 * h = (4/3)π (12)3 => h = 9 cm
A. 2 : 5
B. 1 : 5
C. 3 : 5
D. 4 : 5
The volume of the cone = (1/3)πr2h
Only radius (r) and height (h) are varying.
Hence, (1/3)π may be ignored.
V1/V2 = r12h1/r22h2 => 1/10 = (1)2h1/(2)2h2
=> h1/h2 = 2/5
i.e. h1 : h2 = 2 : 5
A. 252 m
B. 704 m
C. 352 m
D. 808 m
In one resolution, the distance covered by the wheel is its own circumference. Distance covered in 500 resolutions.
= 500 * 2 * 22/7 * 22.4 = 70400 cm = 704 m
A. Rs. 4800
B. Rs. 3600
C. Rs. 3560
D. Rs. 4530
Area of the four walls = 2h(l + b)
Since there are doors and windows, area of the walls = 2 * 12 (15 + 25) – (6 * 3) – 3(4 * 3) = 906 sq.ft.
Total cost = 906 * 5 = Rs. 4530