If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________? August 15, 2021January 22, 2019 by admin If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________? A. 100 cm B. 90 cm C. 80 cm D. 50 cm