Generating capacity connected to the bus bars and ready to take load when switched on is known as____________?
A. firm power
B. cold reserve
C. hot reserve
D. sning reserve
A. firm power
B. cold reserve
C. hot reserve
D. sning reserve
A. Easily damaged by high voltage
B. Cannot be repaired
C. Short service life
D. All of the above
A. diesel engine
B. hydraulic turbine
C. gas turbine
D. steam turbine
E. any of the above
A. Efficient plant operation
B. Power factor improvement at the , generators
C. Penalising high load consumers by increasing the charges for electricity
D. Load shedding
A. average power used during the period
B. average kWh (kW) energy consumption during the period
C. either of the above
D. none of the above
A. Induction motor
B. Under excited synchronous motor
C. Over excited synchronous motor
D. D.C. generator
A. Solar power plant
B. Tidal power plant
C. Wind power plant
D. Any of the above