Skip to content
  • Home
  • Contact Us / Report Error
  • Disclaimer

Water Management

An engineer who is approached by a client for the purpose of design of hydraulic structures like dam. Barrage or Regulator is called ____________________?

August 31, 2021March 29, 2019 by admin
An engineer who is approached by a client for the purpose of design of hydraulic structures like dam. Barrage or Regulator is called ____________________?

A. Chartered Engineer
B. Consulting Engineer
C. Irrigation Engineer
D. All are correct

Categories Water Management

Sediment particles smaller than 0.002 mm which do not settle in water are called____________________?

August 31, 2021March 29, 2019 by admin
Sediment particles smaller than 0.002 mm which do not settle in water are called____________________?

A. Fine silt particles
B. Fine clay particles
C. Colloids
D. All are correct

Categories Water Management

Sliding failure occurs in a solid gravity dam when____________________?

August 31, 2021March 29, 2019 by admin
Sliding failure occurs in a solid gravity dam when____________________?

A. Resultant of all forces cuts the base of the dam out side the toe
B. Resultant of all forces cuts the base at the inner middle third point
C. Ratio of over turning moments exceeds than unity
D. Shear friction factor Is less than 1.5

Categories Water Management

The delta the total water requirement of crop from the time of sowing to harvesting the delta of sugarcane is __________________?

August 31, 2021March 29, 2019 by admin
The delta the total water requirement of crop from the time of sowing to harvesting the delta of sugarcane is __________________?

A. 120cm
B. 100cm
C. 80cm
D. 70cm

Categories Water Management

The delta the total depth of water consumed by a crop from 1st watering when matures, the delta for rice is___________________?

August 31, 2021March 29, 2019 by admin
The delta the total depth of water consumed by a crop from 1st watering when matures, the delta for rice is___________________?

A. 100cm
B. 120cm
C. 80cm
D. 75cm

Categories Water Management

Rabi crops pertains to ___________________?

August 31, 2021March 29, 2019 by admin
Rabi crops pertains to ___________________?

A. Throughout the year
B. Summer season
C. Monsoon season
D. Winter season

Categories Water Management

Development of___________in river is due to meandering ?

August 31, 2021March 29, 2019 by admin
Development of___________in river is due to meandering ?

A. Delta
B. Critical velocity
C. Cutoff
D. Turbulence

Categories Water Management

Weep holes are provided in canal lining to _____________________?

August 31, 2021March 29, 2019 by admin
Weep holes are provided in canal lining to _____________________?

A. improve strength of lining
B. Give additional anchorage against sliding
C. Provide water into branch canals
D. Have drainage facility

Categories Water Management

The season that starts from 1st October and ends on 31st March, runs for 182 days is called __________________?

August 31, 2021March 29, 2019 by admin
The season that starts from 1st October and ends on 31st March, runs for 182 days is called __________________?

A. Rabi season
B. Kharif season
C. Monsoon season
D. Wheat season

Categories Water Management

The ideal crop for wastewater or sewage irrigation is _______________________?

August 31, 2021March 29, 2019 by admin
The ideal crop for wastewater or sewage irrigation is _______________________?

A. Mango
B. Banana
C. Dates
D. Orange

Categories Water Management
Older posts
Newer posts
← Previous Page1 … Page23 Page24 Page25 … Page29 Next →
© 2025 • Built with GeneratePress