Waste Water Engineering

If 2% solution of a sewage sample is incubated for 5 days at 20°C and depletion of oxygen was found to be 5 ppm, B.O.D. of the sewage is____________________?

If 2% solution of a sewage sample is incubated for 5 days at 20°C and depletion of oxygen was found to be 5 ppm, B.O.D. of the sewage is____________________?

A. 200 ppm
B. 225 ppm
C. 250 ppm
D. None of these

If 2% solution of a sewage sample is incubated for 5 days at 20°C and depletion of oxygen was found to be 5 ppm, B.O.D. of the sewage is____________________? Read More »

Civil Engineering Mcqs, Waste Water Engineering

weight of water, the hydraulic mean depth of the sewer and the bed slope w is the unit of the sewer, then the tractive force exerted by flowing water, is________________________?

weight of water, the hydraulic mean depth of the sewer and the bed slope w is the unit of the sewer, then the tractive force exerted by flowing water, is________________________?

A. w r S S
B. w r1/2
C. w r S
D. w r2/3

weight of water, the hydraulic mean depth of the sewer and the bed slope w is the unit of the sewer, then the tractive force exerted by flowing water, is________________________? Read More »

Civil Engineering Mcqs, Waste Water Engineering

The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is________________?

The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is________________?

A. d² (0.011d + 0.785H)/Q
B. d (0.022d + 0.085H)/Q
C. d (0.785d + 0.011H)/Q
D. d (0.285d + 0.011H)/Q

The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is________________? Read More »

Civil Engineering Mcqs, Waste Water Engineering

Assertion A.: A free board of 0.3 m is provided above the top sewage line in septic tanks. Reason (R): It helps to accommodate the scum in the septic tank_________________?

Assertion A.: A free board of 0.3 m is provided above the top sewage line in septic tanks. Reason (R): It helps to accommodate the scum in the septic tank_________________?

A. Both A and R is true and R is the correct explanation of A
B. Both A and R is true but R is not a correct explanation of A
C. A is true but R is false
D. A is false but R is true

Assertion A.: A free board of 0.3 m is provided above the top sewage line in septic tanks. Reason (R): It helps to accommodate the scum in the septic tank_________________? Read More »

Civil Engineering Mcqs, Waste Water Engineering