The minimum diameter of sewer to be adopted is_________________?
A. 10 cm
B. 12.5 cm
C. 15 cm
D. 25 cm
The minimum diameter of sewer to be adopted is_________________? Read More »
Civil Engineering Mcqs, Waste Water Engineering A. 10 cm
B. 12.5 cm
C. 15 cm
D. 25 cm
The minimum diameter of sewer to be adopted is_________________? Read More »
Civil Engineering Mcqs, Waste Water Engineering A. 0.010
B. 0.011
C. 0.012
D. 0.013
The porosity of sediments in sewer pipes, is usually taken as___________________? Read More »
Civil Engineering Mcqs, Waste Water Engineering A. Boiling
B. Adding potassium permanganate
C. Adding sulphuric acid
D. Phenol-di-sulphuric acid
The presence of free ammonia in sewage, is detected by___________________? Read More »
Civil Engineering Mcqs, Waste Water Engineering A. 3 years
B. 3.5 years
C. 4 years
D. 5 years
A. Irrigation
B. Dilution
C. Oxidation
D. Purification
Disposal to sewage in large cities, is done in__________________? Read More »
Civil Engineering Mcqs, Waste Water Engineering A. 204 cu.m
B. 208 cu.m
C. 212 cu.m
D. 216 cu.m
A. Both A and R are true and R is the correct explanation of A
B. Both A and R are true but R is not a correct explanation of A
C. A is true but R is false
D. A is false but R is true
A. Degradation
B. Active decomposition
C. Recovery
D. Cleaner water
The algae dies out in the zone of_____________________? Read More »
Civil Engineering Mcqs, Waste Water Engineering A. 500 litres/km/cm
B. 1000 litres/km/cm
C. 1500 litres/km/cm
D. 2000 litres/km/cm
A. Industrial areas
B. Large town ships
C. Hilly town ships
D. Cities in plains
The drop man holes are generally provided in sewers for____________________? Read More »
Civil Engineering Mcqs, Waste Water Engineering