Tunnel Engineering

In the construction of Metro Railways, “Cut and Cover” method of construction is suitable in situations listed at________________?

In the construction of Metro Railways, “Cut and Cover” method of construction is suitable in situations listed at________________?

Consider the following situations
1. Soil is soft
2. Volume of existing surface traffic on the alignment is heavy
3. Track is at a deeper level
4. Water table is high

A. 1 and 2
B. 1 and 3
C. 1 and 4
D. 2 and 3

In the construction of Metro Railways, “Cut and Cover” method of construction is suitable in situations listed at________________? Read More »

Tunnel Engineering

Assertion A : When rock conditions are favorable, it will not be necessary to take up concrete lining concurrently with the driving operations till the full length of the tunnel has been driven through rock. Reason R : A tunnel through rock, hard or soft, does not need any concrete lining________________?

Assertion A : When rock conditions are favorable, it will not be necessary to take up concrete lining concurrently with the driving operations till the full length of the tunnel has been driven through rock. Reason R : A tunnel through rock, hard or soft, does not need any concrete lining________________?

A. Both A and R are true and R is the correct explanation of A
B. Both A and R are true but R is not the correct explanation of A
C. A is true but R is false
D. A is false but R is true

Assertion A : When rock conditions are favorable, it will not be necessary to take up concrete lining concurrently with the driving operations till the full length of the tunnel has been driven through rock. Reason R : A tunnel through rock, hard or soft, does not need any concrete lining________________? Read More »

Tunnel Engineering

The needle beam method of tunneling______________?

The needle beam method of tunneling______________?

(i) is suitable for soils in which roof can stand for few minutes without support
(ii) is suitable for brick lining
(iii) is suitable for concrete lining
(iv) requires large number of trench jacks

select the answer?
A. only (i) is correct
B. (i), (ii) and (iv) are correct
C. (i), (iii) and (iv) are correct
D. (i) and (ii) are correct

The needle beam method of tunneling______________? Read More »

Tunnel Engineering

Assertion A : English method of tunneling requires more time as compared to other methods of tunneling. Reason R : In English method of tunneling, the masons and excavators have to work alternately/

Assertion A : English method of tunneling requires more time as compared to other methods of tunneling. Reason R : In English method of tunneling, the masons and excavators have to work alternately/

A. Both A and R are true and R is the correct explanation of A.
B. Both A and R are true and R is not the correct explanation of A.
C. A is true but R is false.
D. A is false but R is true.

Assertion A : English method of tunneling requires more time as compared to other methods of tunneling. Reason R : In English method of tunneling, the masons and excavators have to work alternately/ Read More »

Tunnel Engineering

As compared to a single free face, if a charge of explosive is placed equidistant from two faces, then the yield___________________?

As compared to a single free face, if a charge of explosive is placed equidistant from two faces, then the yield___________________?

A. remains same
B. decreases
C. increases by 2.25 times
D. increases by 3.5 times

As compared to a single free face, if a charge of explosive is placed equidistant from two faces, then the yield___________________? Read More »