Once a drawing is determined to be complete, the title block is used to document the change from:

Question: Once a drawing is determined to be complete, the title block is used to document the change from:
[A].

A draft to a finished drawing

[B].

A finished to a working drawing

[C].

An assembly to a finished drawing

[D].

A working drawing to a draft

Answer: Option A

Explanation:

No answer description available for this question.

Architectural dimensioning standards allow for the placement of dimensions inside the floor plan. These inside dimensions locate interior ________.

Question: Architectural dimensioning standards allow for the placement of dimensions inside the floor plan. These inside dimensions locate interior ________.
[A].

door openings and walls

[B].

centers of cabinets

[C].

windows

[D].

all of the above

Answer: Option A

Explanation:

No answer description available for this question.