Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by whitelisting our website.

Technical Drawing

If the roof pitch for a house is identified as 5/12 the height of the roof rises 2 ½” for every 14″ of horizontal run.

Question: If the roof pitch for a house is identified as 5/12 the height of the roof rises 2 ½” for every 14″ of horizontal run.
[A].

True

[B].

False

Answer: Option B

Explanation:

No answer description available for this question.

If the roof pitch for a house is identified as 5/12 the height of the roof rises 2 ½” for every 14″ of horizontal run. Read More »

Architectural Working Drawings, Technical Drawing

A typical set of architectural working drawings would probably include floor plans, foundation plans, elevations, section details, and roof framing plans.

Question: A typical set of architectural working drawings would probably include floor plans, foundation plans, elevations, section details, and roof framing plans.
[A].

True

[B].

False

Answer: Option A

Explanation:

No answer description available for this question.

A typical set of architectural working drawings would probably include floor plans, foundation plans, elevations, section details, and roof framing plans. Read More »

Architectural Working Drawings, Technical Drawing

On a floor plan the dashed line that appears approximately 24″ outside the exterior wall represents the ________.

Question: On a floor plan the dashed line that appears approximately 24″ outside the exterior wall represents the ________.
[A].

sidewalk

[B].

roof overhang

[C].

plumbing drain lines

[D].

none of the above

Answer: Option B

Explanation:

No answer description available for this question.

On a floor plan the dashed line that appears approximately 24″ outside the exterior wall represents the ________. Read More »

Architectural Working Drawings, Technical Drawing

Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________.

Question: Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________.
[A].

change order

[B].

modification slip

[C].

whole new set of drawings

[D].

none of the above

Answer: Option A

Explanation:

No answer description available for this question.

Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________. Read More »

Architectural Working Drawings, Technical Drawing

The architectural drafter usually begins a set of working drawings by creating the ________ plan first.

Question: The architectural drafter usually begins a set of working drawings by creating the ________ plan first.
[A].

foundation

[B].

floor plan

[C].

elevations

[D].

building section

Answer: Option B

Explanation:

No answer description available for this question.

The architectural drafter usually begins a set of working drawings by creating the ________ plan first. Read More »

Architectural Working Drawings, Technical Drawing