A. Design
B. Repeatable
C. Managed
D. Optimizing
Explanation: The CMM is organized into five maturity levels as namely: Initial, Repeatable, Defined, Managed and Optimizing.
A. Design
B. Repeatable
C. Managed
D. Optimizing
Explanation: The CMM is organized into five maturity levels as namely: Initial, Repeatable, Defined, Managed and Optimizing.
A. CMM
B. ISO 9001
C. ISO 9000-3
D. None of the mentioned
Explanation: ISO 9000-3 states that the supplier should carry out reviews to ensure the requirements are met and design methods are correctly carried out.
A. ISO 9001
B. ISO 9000-4
C. CMM
D. All of the mentioned
Explanation: ISO 9001 states that, where, appropriate adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics.
A. evaluations to be performed
B. amount of technical work
C. audits and reviews to be performed
D. documents to be produced by the SQA group
Explanation: All other options support a SQA plan
A. 0
B. 2
C. 4
D. 6
Explanation: Not performed, performed, managed, defined, quantitatively managed, and optimizing are the six points.
A. True
B. False
Explanation: It is always best to start process analysis with an existing model. People then may extend and change this.
A. Introducing new practices, methods or processes
B. Introducing new team members to existing project
C. Introducing or removing deliverable
D. Introducing new roles or responsibilities
Explanation: Adding more developers aid to process completion rather than changing it.
A. Deliverable
B. Activity
C. Condition
D. Process
A. True
B. False
Explanation: The definition is of a system development process.
A. three
B. four
C. five
D. six
Explanation: Process measurement, analysis and change are the three stages.