Product layout is employed for____________________?
Product layout is employed for____________________? A. batch productionB. continuous production C. effective utilization of machine D. all of the above E. none of the above
Product layout is employed for____________________? A. batch productionB. continuous production C. effective utilization of machine D. all of the above E. none of the above
For a product layout the material handling equipment must _________________? A. have full flexibility B. employ conveyor belts, trucks, tractors etc. C. be a general purpose typeD. be designed as special purpose for a particular application E. arranging shops according…
ABC analysis deals with_________________? A. analysis of process chart B. flow of material C. ordering schedule of jobD. controlling inventory costs money E. all of the above
Motion study is used for________________? Choose the wrong statement? A. improving a work method B. improvising a work method C. designing a work method D. providing a schematic frameworkE. reducing inventory costs
One time measurement unit (TMU) in method time measurement system equals______________? A. 0.0001 minuteB. 0.0006 minute C. 0.006 minute D. 0.001 minute E. 0.06 minute
Time study is__________________? A. the appraisal, in terms of time, of the value of work involving human effort B. machine setting time C. time taken by workers to do a job D. method of fixing time for workers E. method…
Per cent idle time for men or machines is found by___________________? A. work sampling B. time study C. method study D. work study E. ABC analysis
Job evaluation is the method-of determining the________________? A. relative worth of jobs B. skills required by a worker C. contribution of a worker D. contribution of a job E. effectiveness of various alternatives
Expediting function consists in keeg a watch on__________________? A. operator’s activityB. flow of material and in case of trouble locate source of trouble C. minimising the delays D. making efficient despatching E. none of the above
Work study is done with the help of_______________? A. process chart B. material handlingC. stop watch D. all of the above E. none of the above