Annual operating expenditure of a power plant consists of_________?

August 11, 2021June 30, 2018 by QuizMaster

Annual operating expenditure of a power plant consists of_________?

A. fixed charges
B. semi-fixed charges
C. running charges
D. all of the above

Categories Power Generation

Which of the following load is responsible for lower power factor of supply system__________?

August 11, 2021June 30, 2018 by QuizMaster

Which of the following load is responsible for lower power factor of supply system__________?

A. induction motors
B. resistive loads
C. synchronous Motors
D. all of the above

Categories Power Generation

Load factor of a power station is defined as____________?

August 11, 2021June 30, 2018 by QuizMaster

Load factor of a power station is defined as____________?

A. maximum demand/average load
B. average load x maximum demand
C. average load/maximum demand
D. none of the above

Categories Power Generation

Load curve is useful in deciding the__________?

August 11, 2021June 30, 2018 by QuizMaster

Load curve is useful in deciding the__________?

(a) A. operating schedule of generating units
B. sizes of generating units
C. total installed capacity of the plant
D. all of the above

Categories Power Generation

One kilowatt hour is equal to_________?

August 11, 2021June 30, 2018 by QuizMaster

One kilowatt hour is equal to_________?

A. 532 k cal.
B. 735 k cal.
C. 746 k cal.
D. 860 k cal.

Categories Power Generation

If the load factor of a power station is high then its cost of generation will be_______?

August 11, 2021June 30, 2018 by QuizMaster

If the load factor of a power station is high then its cost of generation will be_______?

A. High.
B. Low.
C. Remain same.
D. Depend upon plant type.

Categories Power Generation

At low value of power factor, the cost of generation of a power station will be____________?

August 11, 2021June 30, 2018 by QuizMaster

At low value of power factor, the cost of generation of a power station will be____________?

A. high
B. low
C. remain same
D. none of the above

Categories Power Generation

Compounding of steam turbine is done for_______________?

August 11, 2021June 30, 2018 by QuizMaster

Compounding of steam turbine is done for_______________?

A. reducing the work done
B. increasing the rotor speed
C. reducing the rotor speed
D. balancing the turbine

Categories Power Generation

The value of the reheat factor is of the order of_____________?

August 11, 2021June 30, 2018 by QuizMaster

The value of the reheat factor is of the order of_____________?

A. 0.8 to 1.0
B. 1.0 to 1.05
C. 1.1 to 1.5
D. above 1.5

Categories Power Generation

Reheat factor is the ratio of_____________?

August 11, 2021June 30, 2018 by QuizMaster

Reheat factor is the ratio of_____________?

A. isentropic heat drop to useful heat drop
B. adiabatic heat drop to isentropic heat drop
C. cumulative actual enthalpy drop for the stages to total is isentropic enthalpy heat drop