Settling velocity increases with_______________?

June 4, 2021January 17, 2019 by admin
Settling velocity increases with_______________?

A. specific gravity of solid particles
B. size of particles
C. depth of tank(Correct)
D. temperature of liquid

 

Categories Environmental Engineering

The correct relation between theoretical oxygen demand (TOD), Biochemical oxygen demand (BOD) and Chemical oxygen demand (COD) is given by_______________?

June 4, 2021January 17, 2019 by admin
The correct relation between theoretical oxygen demand (TOD), Biochemical oxygen demand (BOD) and Chemical oxygen demand (COD) is given by_______________?

A. TOD>BOD>COD
B. TOD>COD>BOD(Correct)
C. BOD>COD>TOD
D. COD>BOD>TOD

 

Categories Environmental Engineering

The ratio of 5 day BOD to ultimate BOD is about_______________?

August 13, 2021January 17, 2019 by admin
The ratio of 5 day BOD to ultimate BOD is about_______________?

A. 1/3
B. 2/3
C. 3/4
D. 1.0

Categories Environmental Engineering

The minimum dissolved oxygen which should always be present in water in order to save the aquatic life is______________?

August 13, 2021January 17, 2019 by admin
The minimum dissolved oxygen which should always be present in water in order to save the aquatic life is______________?

A. 1 ppm
B. 4 ppm
C. 10 ppm
D. 40 ppm

Categories Environmental Engineering

Dissolved oxygen in streams is______________?

August 13, 2021January 17, 2019 by admin
Dissolved oxygen in streams is______________?

A. maximum at noon
B. minimum at noon
C. maximum at midnight
D. same throughout the day

Categories Environmental Engineering

The means of access for inspection and cleaning of sewer line is known as_______________?

August 13, 2021January 17, 2019 by admin
The means of access for inspection and cleaning of sewer line is known as_______________?

A. inlet
B. manhole
C. drop manhole
D. catch basin

Categories Environmental Engineering

Sewage treatment units are designed for_______________?

August 13, 2021January 17, 2019 by admin
Sewage treatment units are designed for_______________?

A. maximum flow only
B. minimum flow only
C. average flow only
D. maximum and minimum flow

Categories Environmental Engineering

Corrosion in concrete sewers is caused by______________?

August 13, 2021January 17, 2019 by admin
Corrosion in concrete sewers is caused by______________?

A. septic conditions
B. dissolved oxygen
C. chlorine
D. nitrogen

Categories Environmental Engineering

Septic tank is a______________?

June 4, 2021January 17, 2019 by admin
Septic tank is a______________?

1) settling tank
2) digestion tank
3) aeration tank

The correct answer is?

A. only (1)
B. (1) and (2)(Correct)
C. (1) and (3)
D. only (3)

 

Categories Environmental Engineering

Generally the detention period for grit chambers is kept as_______________?

August 13, 2021January 17, 2019 by admin
Generally the detention period for grit chambers is kept as_______________?

A. 1 minute
B. 5 minutes
C. 2-4 hours
D. 12 hours

Categories Environmental Engineering