A. total duration of project is reduced
B. total duration of project is increased
C. uniform demand of resources is achieved
D. cost of project is controlled
A. total duration of project is reduced
B. total duration of project is increased
C. uniform demand of resources is achieved
D. cost of project is controlled
A. the fund for rebuilding a structure when its economic life is over
B. raised to meet maintenance costs
C. the total sum to be paid to the municipal authorities by the tenants
D. a part of the money kept in reserve for providing additional structures and structural modifications
A. increase in rates of only important materials
B. variation in cost in materials element, labour element and petrol-oil-lubricant element
C. variation in total cost of the project on an ad hoc basis
D. rate of inflation
A. crash time
B. normal time
C. optimistic time
D. between normal time and crash time
Consider the following statements ?
1. greater than Total Float.
2. greater than Independent Float
3. equal to Total Float.
4. less than Independent Float. Of these statements
A. 1 and 4 are correct
B. 2 and 3 are correct
C. 1 and 4 are correct
D. 1 and 2 are correct
A. 3.7 years
B. 4.23 years
C. 5 years
D. 7.87 years
A. 4 days
B. 6 days
C. 10 days
D. 16 days
A. 50%
B. 84.1%
C. 99.9%
D. 100%
A. Rs. 31050
B. Rs. 34500
C. Rs. 37950
D. Rs. 50000
A. 10000 kg
B. 12500 kg
C. 22500 kg
D. 5000 kg