A. Total budget for the project
B. Time phased budget for the project
C. Total budget for the project including the contingency budget
D. Total budget for the project including the contingency budget and the management reserve
A. Total budget for the project
B. Time phased budget for the project
C. Total budget for the project including the contingency budget
D. Total budget for the project including the contingency budget and the management reserve
A. Bad quality is acceptable, but bad grade is not.
B. Bad grade is acceptable, but bad quality is not.
C. Neither bad grade nor quality is acceptable.
D. Grade and quality is the same thing.
A. 5%
B. 10%
C. 15%
D. 20%
A. testing of stones
B. quarrying of stones
C. dressing of stones
D. none of the above
A. quartz
B. feldspar
C. mica
D. none of the above
A. Maintaining the desired quality
B. Exceeding the desired quality
C. Continuously improving the quality
D. Following the quality
A. marble
B. lime stone
C. compact sand stone
D. granite
A. shale
B. lime stone
C. sand stone
D. granite
A. arches
B. rubble masonry
C. roads
D. retaining walls
A. quartz
B. mica
C. gypsum
D. none of the above