Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by whitelisting our website.

Civil Engineering Mcqs

If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________?

If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________?

A. 100 cm
B. 90 cm
C. 80 cm
D. 50 cm

If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________? Read More »

Civil Engineering Mcqs, Waste Water Engineering

The formula which accepts the value of rugosity coefficient n = 0.012 to be used in Manning’s formula, is given by______________________?

The formula which accepts the value of rugosity coefficient n = 0.012 to be used in Manning’s formula, is given by______________________?

A. Bazin
B. Crimp and Bruges
C. William-Hazen
D. Kutter

The formula which accepts the value of rugosity coefficient n = 0.012 to be used in Manning’s formula, is given by______________________? Read More »

Civil Engineering Mcqs, Waste Water Engineering

For treating the sewage of a large city, you will recommend_________________?

For treating the sewage of a large city, you will recommend_________________?

A. A sedimentation tank and an activated sludge treatment plant
B. A plant consisting of Imhoff tanks with low rate trickling filters
C. Sedimentation tanks with high rate trickling filters
D. None of these

For treating the sewage of a large city, you will recommend_________________? Read More »

Civil Engineering Mcqs, Waste Water Engineering