For sewer mains of 0.5 to 1 m diameter, the ratio of maximum daily sewage flow to the average daily sewage flow is assumed__________________?
A. 1.5
B. 2.0
C. 2.5
D. 3.0
A. 1.5
B. 2.0
C. 2.5
D. 3.0
A. D
B. D /2
C. D/3
D. D/4
A. 5 – 10 years
B. 15 – 20 years
C. 30 – 40 years
D. 40 – 50 years
The design period of sewage treatment works in normally_________________? Read More »
Civil Engineering Mcqs, Waste Water Engineering A. Fit for discharge into any open drain
B. Foul and contains dissolved and suspended solids
C. As good as that from a complete treatment
D. None of these
The effluent of a septic tank is_________________? Read More »
Civil Engineering Mcqs, Waste Water Engineering A. A particle to travel along its length
B. A particle to travel from top surface to bottom sludge zone
C. The flow of sewage to fill the tank
D. None of these
A. Liquid waste
B. Sullage
C. Sewage
D. None of these
A. Near the inner surface of the pipe
B. Near the outer surface of the pipe
C. Both A. and B.
D. With elliptical cage
A. 1.5
B. 2.0
C. 3.0
D. 4.0
A. Cast iron sewers
B. Cement concrete sewers
C. Glazed bricks sewers
D. Stone ware sewers
A. 5 m
B. 5.5 m
C. 6.5 m
D. 7 m