A 66.6% risk is considered as__________________?
A. very low
B. low
C. moderate
D. high
Explanation: The probability of the risk might be assessed as very low (75%).
A. very low
B. low
C. moderate
D. high
Explanation: The probability of the risk might be assessed as very low (75%).
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned
A. Risk assessment
B. Risk generation
C. Risk control
D. None of the mentioned
Explanation: Risk management activities would never want a new risk to be generated.
A. Managerial risks
B. Technology risks
C. Estimation risks
D. Organizational risks
A. Version
B. Codeline
C. Baseline
D. None of the mentioned
A. B.Beizer
B. Rajiv Gupta
C. B.W.Bohem
D. Gregg Rothermal
Explanation: Barry Boehm introduced a hierarchy of software estimation models bearing the name COCOMO, for COnstructive COst MOdel
A. LOC
B. FP
C. LOC and FP
D. None of the mentioned
Explanation: LOC or Line of Code is a direct measure to estimate project size.