Load factor of a power station is defined as____________?
A. maximum demand/average load
B. average load x maximum demand
C. average load/maximum demand
D. none of the above
Load factor of a power station is defined as____________?
A. maximum demand/average load
B. average load x maximum demand
C. average load/maximum demand
D. none of the above