Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by whitelisting our website.

If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________?

If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________?

A. 100 cm
B. 90 cm
C. 80 cm
D. 50 cm