If a > b and b > a. Then ?
B. a ≠ b
C. Cannot be evaluated
D. None
		A. 3.34
B. 2
C. 4.5
D. 5.5
Area of the path = Area of the outer circle – Area of the inner circle = ∏{4/2 + 25/100}2 – ∏[4/2]2
= ∏[2.252 – 22] = ∏(0.25)(4.25)  { (a2 – b2 = (a – b)(a + b) }
= (3.14)(1/4)(17/4) = 53.38/16 = 3.34 sq m
		A. 225 sq m
B. 220 sq m
C. 100 sq m
D. 30 sq m
		A. 12:00 pm
B. 2:00 am
C. 12:00 am
D. 10:00 pm
Jameel works for 5 hours. So he completes 5/15 = 1/3 of the task Nasir has to complete 2/3rd of the task 12*2/3 = 8 hours are needed. He completes the task at 12:00 am.
		A. 13
B. 11
C. 12
D. 15
A completes 2*(1/8) = 1/4th of the work 2/3rd of the remaining work
= (3/4) * (2/3) = 1/2 B completes 1/2 of the work in
(1/2)÷(1/14) = 7 days C completes 1/4th of the work in
(1/4)÷(1/16) = 4 days They take 13 days to complete the work
		A. 420
B. 515
C. 435
D. 518
		A. Rs. 3642.40
B. Rs. 3868.80
C. Rs. 4216.20
D. Rs. 4082.40
Length of the first carpet = (1.44)(6) = 8.64 cm
Area of the second carpet = 8.64(1 + 40/100) 6 (1 + 25/100)
= 51.84(1.4)(5/4) sq m = (12.96)(7) sq m
Cost of the second carpet = (45)(12.96 * 7) = 315 (13 – 0.04) = 4095 – 12.6 = Rs. 4082.40