PMTP (predetermined motion time systems) include___________________?
A. MTM (method time measurement)
B. WFS (work factor systems)
C. BNTS (basic motion time study)
D. all of the above
E. none of the above
A. MTM (method time measurement)
B. WFS (work factor systems)
C. BNTS (basic motion time study)
D. all of the above
E. none of the above
Gnatt chart provides information about the________________? A. material handling B. proper utilisation of manpowerC. production schedule D. efficient working of machine E. all of the above
Replacement studies are made on the fol-lowing basis_________________? A. annual cost method B. rate of return method C. total life average method D. present worth methodE. any one of the above
In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if_________________? A. complete details’of items in, waiting line are known B. arrival and waiting times are known and can be grouped to form a waiting line model C. all variables and constants are known and form a linear equationD. the…
The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as_________________? A. Dry work Plan B. Halsey Premium Plan C. Taylor Plan D. Bedaux PlanE. Rowan Plan
The technique for establishing and maintaining priorities among the various jobs of any project is known as___________________? A. event flow scheduling techniqueB. critical ratio scheduling C. slotting technique for scheduling D. short interval scheduling E. none of the above
In perpetual inventory control, the material is checked as it reaches its__________________? A. minimum value B. maximum value C. average value D. middle value E. alarming value