7589 – ? = 3434
Question:
7589 – ? = 3434
[A].
4242
4155
1123
11023
7589 – ? = 3434
[A].
[B].
[C].
[D].
Answer: Option B
Explanation:
Let 7589 -x = 3434
Then, x = 7589 – 3434 = 4155
| 1 |
| 22 |
[B].
| 3 |
| 22 |
[C].
| 2 |
| 91 |
[D].
| 2 |
| 77 |
Answer: Option C
Explanation:
Let S be the sample space.
| Then, n(S) | = number of ways of drawing 3 balls out of 15 | |||
| = 15C3 | ||||
|
||||
| = 455. |
Let E = event of getting all the 3 red balls.
| n(E) = 5C3 = 5C2 = | (5 x 4) | = 10. |
| (2 x 1) |
| P(E) = | n(E) | = | 10 | = | 2 | . |
| n(S) | 455 | 91 |
[B].
[C].
[D].
Answer: Option A
Explanation:
Let the number be x.
| Then, x + 17 = | 60 |
| x |
x2 + 17x – 60 = 0
(x + 20)(x – 3) = 0
x = 3.
[B].
[C].
[D].
| 10 | 1 | days |
| 2 |
Answer: Option C
Explanation:
| (B + C)’s 1 day’s work = | 1 | + | 1 | = | 7 | . | ||
| 9 | 12 | 36 |
| Work done by B and C in 3 days = | 7 | x 3 | = | 7 | . | ||
| 36 | 12 |
| Remaining work = | 1 – | 7 | = | 5 | . | ||
| 12 | 12 |
| Now, | 1 | work is done by A in 1 day. |
| 24 |
| So, | 5 | work is done by A in | 24 x | 5 | = 10 days. | ||
| 12 | 12 |
[B].
[C].
[D].
Answer: Option C
Explanation:
Money collected = (59.29 x 100) paise = 5929 paise.
Number of members = 5929 = 77.
A. 40 Minutes
B. 1 Hour
C. 1 hr 15 Min
D. 1 Hr 30 Min
Explanation:
Speed upstream = 2km/hr.
Speed downstream = 6 km/hr
Speed in stationary water = ½ (6 + 2) km/hr = 4 km/hr
Time is taken to cover 5 km in stationary water
= (1/4 x 5) 1 hr 15 min
| 1 |
| 13 |
[B].
| 3 |
| 13 |
[C].
| 1 |
| 4 |
[D].
| 9 |
| 52 |
Answer: Option B
Explanation:
Clearly, there are 52 cards, out of which there are 12 face cards.
| P (getting a face card) = | 12 | = | 3 | . |
| 52 | 13 |