6 2/3 * 9 3/5 * 2 1/3 + 1 1/3 = __________?
A. 150 1/3
B. 150 2/3
C. 149 2/3
D. 149 1/3
Explanation:
6 2/3 * 9 3/5 * 2 1/3 + 1 1/3 = 20/3 * 48/5 * 7/3 + 4/3
= 448/3 + 4/3 = 452/3 = 150 2/3
A. 150 1/3
B. 150 2/3
C. 149 2/3
D. 149 1/3
Explanation:
6 2/3 * 9 3/5 * 2 1/3 + 1 1/3 = 20/3 * 48/5 * 7/3 + 4/3
= 448/3 + 4/3 = 452/3 = 150 2/3
Sum of 11 numbers = 11×10.9 = 119.9
Sum of 1st 6 numbers = 6×10.5 = 63
So, sum of last 5 numbers = 119.9-63 = 56.9
And sum of last 6 numbers = 6×11.4 = 68.4
Hence sixth number will be = 68.4-56.9= 11.5
A. 9
B. 16
C. 8
D. 12
Explanation:
Applying BODMAS rule
= 7 + 1/2 of [8 – 4 / 2 * 3 – 2 + (4 + 2) – 2 * 2]
= 7 + 1/2 of [8 – 2 * 3 – 2 + 6 – 4]
= 7 + 1/2 of (2) = 8
A. 12 kmph
B. 13 kmph
C. 14 kmph
D. 15 kmph
Explanation:
The ratio of the times taken is 2:1.
The ratio of the speed of the boat in still water to the speed of the stream = (2+1)/(2-1) = 3/1 = 3:1
Speed of the stream = 42/3 = 14 kmph.
A. Rs.50
B. Rs.60
C. Rs.80
D. Rs.90
Explanation:
Let C.P. of clock be Rs. x.
Then, C.P. of 90 clocks = Rs. 90x.
[(110% of 40x) + (120% of 50x)] – (115% of 90x) = 40
44x + 60x – 103.5x = 40
0.5x = 40 => x = 80
A. 18%
B. 9%
C. 15%
D. 6%
A. 5 5⁄11
B. 4 5⁄11
C. 6 4⁄11
D. 6 5⁄11
A can complete the work in 12 days working 8 hours a day
=> Number of hours A can complete the work = 12×8 = 96 hours
=> Work done by A in 1 hour = 1/96
B can complete the work in 8 days working 10 hours a day
=> Number of hours B can complete the work = 8×10 = 80 hours
=> Work done by B in 1 hour = 1/80
Work done by A and B in 1 hour = 1/96 + 1/80 = 11/480
=> A and B can complete the work in 480/11 hours
A and B works 8 hours a day
Hence total days to complete the work with A and B working together
= (480/11)/ (8) = 60/11 days = 5 5⁄11 days