A. 2.5
B. 5
C. 12.5
D. 17.5
A. 2.5
B. 5
C. 12.5
D. 17.5
A. Screwing
B. Welding
C. Brazing
D. All A., B. and C.
A. Plate tower is preferred, if interstage cooling is required to remove heats of reaction or
solution
B. Plate tower is preferred over packed tower, if the operation involves liquids containing
dispersed solids
C. The total weight of a dry plate tower is usually much more than that of a dry packed tower
designed for the same duty
D. In operations involving large temperature changes. (e.g. distillation), plate towers are
preferred over packed towers as the packing may be crushed due to large temperature changes
A. Lug
B. Skirt
C. Saddle
D. Guy wire
A. Minimum cleaning lane of 6.5 mm is provided, when tubes are on a square pitch
B. Minimum tube sheet thickness (in which tubes are fixed) is equal to the O.D. of the tube upto
15 mm tube diameter; and for > 15 mm tube diameter, tube sheet thickness is smaller than
tube diameter
C. O.D. of the tube is 6 to 40 mm while the tube lengths used are 0.5, 2.5, 3.0, 4.0, 5.0, 6 metres
D. All A., B. & C.
A. Increases
B. Decreases
C. Remain unaffected
D. None of these
A. Smaller than
B. Greater than
C. Equal to
D. Not related with
A. Foamy
B. Scaling
C. Viscous
D. Salting
A. Long tube vertical evaporator
B. Short tube vertical evaporator
C. Horizontal tube evaporator
D. None of these
A. 5 and 10
B. 45 and 75
C. 180 and 300
D. 300 and 500